Program Number |
Program Name |
AIA/CES
Credit |
HSW
Credit |
Time
(minimum) |
Learning
Units |
AIA 001-CSI |
Introduction to Urethanes in construction
Presented at the Vermont Construction Specifiers Institute conference |
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
AIA 101-R&R
AIA 102-R&R
AIA 103-R&R |
Historic renovation and remediation using polyurethane foam technology
Presented at the Restoration & Renovation 2002 conference |
Yes
Yes
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
AIA201-TVII
AIA202-TVII
AIA203-TVII |
Case study - Ice dam remediation for Northeast Ski-Area Condominiums
Presented at the DOE, ASHRAE, ORNL Thermal Performance of the Exterior Envelopes of Buildings VII (1998) |
Yes
Yes
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
AIA301-TXI |
Methods for quality assuring high-performance thermal envelopes
Includes paper presented at the SPIE - Thermosense XI International
Symposium on Aerospace/Defense Sensing, Simulation, and Controls. |
Yes |
No |
1 hour |
1 |
|
|
|
|
|
|
BES 401-TXX
BES 402-TXX |
Thermographic inspection and quality assurance of energy conservation procedures for electric vehicles I, II
Presented at the SPIE - Thermosense XX International Symposium on Aerospace/Defense Sensing, Simulation, and Controls. |
No
No |
No |
1 hour |
|
|
|
|
|
|
|
BES 501-DT
BES 502-DT |
Air leakage testing techniques - I, II
Air leakage in thermal envelopes - methods of locating and preventing air leakage |
No
No |
No |
1 hour |
|
|
|
|
|
|
|
BES 601-IAQ |
Construction detailing vs. indoor air quality
Indoor air quality |
No |
No |
1 hour |
|
|
|
|
|
|
|
|
Exterior Cavity Wall Applications I, II, & III |
|
|
|
|
AIA701-Ext |
A General Overview of the Exterior Cavity Wall Approach to Creating High-Performance Building Envelopes - Program number AIA701 |
Yes |
Yes |
1 hours |
1 |
AIA702-Ext |
Details and Specifications for Cost-effective and Energy-Efficient Exterior Cavity-Wall Applications - Program number AIA702 |
Yes |
Yes |
1 hours |
1 |
|
|
|
|
|
|
BES 801 |
Basement and Crawlspaces |
|
|
|
|
|
|
|
|
|
|
AIA901 |
Introduction to Building Envelope Commissioning - Program AIA 901 |
Yes |
Yes |
1 hour |
1 |
AIA902 |
The Cost Reduction Protocol for High-Performance Building Envelopes - Program AIA 902 |
No |
No |
1 hour |
1 |
|
|
|
|
|
|
BES 1001 |
Mold and Mildew |
No |
No |
1 hour |
|
|
|
|
|
|
|
BES 1101 |
Unique applications |
No |
No |
1 hour |
|
|
|
|
|
|
|
BES 1301 |
Design Strategies |
No |
No |
1 hour |
|
|
|
|
|
|
|